Flowbricks
Hundreds of control points, time-stamped and signed.
Operator checks move off paper: checklists of over a hundred points, named double validation and time-stamped traceability.
Sans la seconde signature, l'étape ne se referme pas et la campagne reste ouverte.
Does a paper checklist do the job? Not on the day someone asks you for proof. A check that is neither dated nor signed never happened.
The problem, our answer.
Before
What we built
What was delivered
A quality control tool designed for the workstation.
Structured checklists
Over a hundred points grouped by step, in the real order of operations.
Double validation
Sensitive points require counter-validation by a second operator or a manager, identified by name.
Time-stamped traceability
Every validation carries its author and its time: the quality file builds up as production goes.
6 modules delivered in total
Are your checks still on paper?
Let's talk about the traceability a tool at the workstation would give you.
Book a meeting